Start with the quote, not the brochure
Ask for a per-kW rate, the module and inverter models, what is included, what is excluded, and how the subsidy is treated. A quote that cannot survive a line-by-line comparison with another installer is a warning sign, however glossy the presentation.
Insist on a survey before signing
Orientation, shading, roof structure, cable route and meter location decide the design. Remote quotes built from satellite images miss water tanks, parapets and lift rooms. A company that will not visit before asking for a deposit is selling a template, not a system.
Check the subsidy and net-metering paperwork
Ask who files the PM Surya Ghar application, who prepares the MSEDCL net-metering file, what happens if an application is rejected, and what is charged for that work. 'We handle everything' is not an answer you can hold anyone to.
Verify registrations yourself
Check GST or UDYAM registration, MNRE and MSEDCL registration status, the office address, and recent installations in Pune you can visit with the owner's permission. Do not rely on badges on a website; verify the numbers behind them.
Read the warranty as a contract
Module and inverter warranties are manufacturer-backed. Workmanship, mounting structure and service response are the installer's responsibility. Get the years, exclusions and response times in writing, and check who honours the warranty if the installer stops trading.
What we publish, so you can compare
DSP Power Infra lists its Pune office, a 1–200 kW rate card, a survey-first process, a free calculator, and written guidance on subsidy and net metering. Judge us on this checklist alongside every other quote you receive.
Want this applied to your roof?
Run the calculator, or send your bill and we will come back with honest numbers.

