Lower bills
Generate your own power through the day and offset what you buy from the grid. The size is matched to your actual consumption, not a sales target.
DSP POWER INFRASOLAR EPC SOLUTIONS
Your roof, your bill and your routine decide the right system. We survey first, explain every option, and handle installation and subsidy paperwork end to end.
Your roof, your bill and your routine decide the right system. We survey first, explain every option, and handle installation and subsidy paperwork end to end.
Generate your own power through the day and offset what you buy from the grid. The size is matched to your actual consumption, not a sales target.
Eligible homes can claim up to ₹78,000 under PM Surya Ghar. We help with the portal application, approvals and inspections so you don't chase paperwork.
Survey, design, supply, installation and commissioning by DSP — no juggling panel sellers, electricians and installers.
Mounting structure, anchoring and cable routing planned for monsoon, heat and wind at your specific site.
Every step has a clear output you can review before the next one begins.
Send your average monthly bill and PIN code. We estimate consumption and a sensible system size.
We measure usable roof area, check shadows, structure and your meter connection.
You see the design, components, cost, subsidy estimate and assumptions — in writing.
Our team installs, commissions and helps with net metering and subsidy steps.
| System | Monthly bill it suits | Roof area (approx.) | PM Surya Ghar subsidy* |
|---|---|---|---|
| 1 kW | Up to ₹1,200 | 80 sq ft | ₹30,000 |
| 2 kW | ₹1,200 – ₹2,400 | 160 sq ft | ₹60,000 |
| 3 kW | ₹2,400 – ₹4,000 | 240 sq ft | ₹78,000 (cap) |
| 5 kW | ₹4,000 – ₹7,000 | 400 sq ft | ₹78,000 (cap) |
*Subsidy slabs as published under PM Surya Ghar; eligibility and current rules must be verified. Bill ranges assume ~₹8/unit and ~120 kWh/kW/month — your survey confirms the real size.
Anchoring points are planned on your roof type (RCC or metal sheet) and sealed properly. We inspect the structure before design and leave the site clean.
A standard on-grid system shuts down during outages for safety (anti-islanding). If you need backup, ask us about hybrid configurations with batteries.
Typically a few working days on site once material is ready and approvals are in place. The survey-to-switch-on timeline depends on net metering and subsidy approvals.
Many banks and NBFCs offer solar loans, and some offer EMI options. Use our EMI tool to explore repayments; final terms come from the lender.
Share a few details and we'll come back with honest numbers — size, cost, subsidy position and what needs verifying on site.