1 kW → ₹30,000 · 2 kW → ₹60,000

PM Surya Ghar, explained step by step.
Up to ₹78,000 for eligible residential rooftops. Here is the honest process — amounts, eligibility, paperwork and realistic timelines.
What the scheme pays.
Residential slabs as published. Verify current rules on the official portal before deciding.
Added on top of the first slab
3 kW and above all reach the cap
Separate group-housing route, confirmed by DSP. Individual flats are not eligible; eligibility is checked for the specific society before we quote.
Commercial, industrial and typically off-grid systems are not eligible. Residential systems above 3 kW stay capped at ₹78,000.
Five steps to the bank credit.
DSP handles installation and documents; government approvals set the pace.
Check eligibility
You need a residential connection, ownership or rights over the roof, and a system within scheme limits. Group housing societies follow a separate route for common areas at ₹18,000/kW.
Register on the portal
Create an account at pmsuryaghar.gov.in with your electricity consumer number and mobile. Apply for rooftop solar and wait for feasibility approval.
Install with a registered vendor
Installation must be by a registered vendor with approved equipment (ALMM-listed modules). DSP handles design and installation to scheme requirements.
Apply for net metering
After installation, apply for net metering through the portal; the DISCOM inspects and installs the bi-directional meter.
Submit for subsidy
Upload installation details, bank account and documents. After inspection, the subsidy is credited directly to your bank account.
Subsidy questions, answered honestly
For eligible residential systems: ₹30,000/kW for the first 2 kW plus ₹18,000 for the third kW, capped at ₹78,000. A 1 kW system gets ₹30,000; 2 kW gets ₹60,000; 3 kW gets ₹78,000, and the amount stays at ₹78,000 however much larger the system is.
Commercial and industrial installations, and typically off-grid systems. Individual flats in housing societies are not covered; society common areas use a separate route.
Society common-area systems are supported under the group-housing route at ₹18,000/kW, separate from the residential slabs. We confirm eligibility for the specific society before quoting.
It depends on portal feasibility approval, DISCOM inspection and verification — commonly several weeks after commissioning. We track the steps with you but cannot control government timelines.
Yes. Amounts, equipment lists and processes are revised periodically. Always verify on the official portal before deciding — our figures are a planning guide, not a guarantee.