What a society can solarise
The eligible load is the common meter: lifts, water pumps, staircase and lobby lighting, security, and clubhouse common areas. Individual flats are separate residential connections and cannot be clubbed into the society's group-housing application.
The ₹18,000 per kW route
Group housing societies and residential welfare associations can claim ₹18,000 per kW of installed common-area capacity under PM Surya Ghar's group-housing route. That is separate from the ₹30,000/₹18,000 residential slabs and does not share their ₹78,000 cap. Eligibility depends on the society's registration and the application being filed correctly.
Why we do not publish a society rate
Two societies with the same capacity can need different structures, cable routes and metering. Older Pune societies often have load-bearing roofs that need a structural check; newer towers have parapets, water tanks and lift rooms that dictate layout. We survey, then quote — there is no honest single per-kW number.
What drives the price
Capacity and module choice, elevated structure height, cable length from terrace to meter room, the number of meters and protection devices, access for modules, and whether the terrace is shared with water tanks or mobile towers.
The approval path
A committee resolution and NOC start the file. After the survey and proposal, the society signs off, we install and commission, and the MSEDCL net-metering application goes in for the common connection. Bills then show import and export on the common meter.
Who looks after it
Agree the cleaning and inspection schedule in writing before installation, not after. Dust, monsoon and lift-room shading are the usual causes of underperformance; a simple O&M plan keeps generation close to the design estimate.